6.3 Post-installation checklist
Verify items in this checklist after you have completed all installation steps.
Table 14 Post-installation checklist
Item Yes No Comment
Mechanical installation stable and
secure
DGA monitor is installed vertically and
not tilted more than 5 degrees
Mains power connection and protective
grounding verified
All unused cable glands blocked and
cable glands tightened
Operation of relays tested
Oil pipe connections checked for leaks
Chapter 6 – Installation report