EasyManua.ls Logo

Vatech A9

Vatech A9
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Choosing an Installation Site
vatech A9 (Model: PHT-30CSS) Installation Manual 11
English
2. Choosing an Installation Site
2.1 Room Requirements
The equipment’s location must allow the operator to
observe the patient clearly during the imaging.
The operator must stay close to the patient during the
imaging.
DO NOT install the equipment on a thick carpet.
Install the equipment on the anti-static floor.
Install the PC monitor, Emergency Stop Switch, and X-
ray Exposure Switch close to the operator so that
he/she can use them simultaneously in an emergency.
<Without CEPH Unit (optional): 2,500 mm (L) x 1,700 mm (W) or wider >
1,700 / 67”
2,500 / 98.5

Table of Contents

Other manuals for Vatech A9

Related product manuals