4. Installing the Equipment: Base Stand (Optional)
vatech A9 (Model: PHT-30CSS) Installation Manual 57
2. Drill the floor holes of size 12 mm x 30 mm (depth) using the concrete hammer
drill.
3. Remove the debris and clean the holes using the dust pump.
4. Remove nuts and washers, put the anchor bolts into the holes.
5. Secure the anchor bolts with the hammer.