EasyManua.ls Logo

Vatech A9

Vatech A9
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
vatech A9 (Model: PHT-30CSS) Installation Manual 63
English
4.7 Leveling the Equipment
Required Tool
T-shaped Hex
Wench
8 mm / 0.3”
Spirit Level N/A
Ensure to place the Spirit Level on the indicated
locations in this manual for an accurate reading.
1. Prepare a Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front.
3. Turn all nine screws in marked locations clockwise.

Table of Contents

Other manuals for Vatech A9

Related product manuals