EasyManua.ls Logo

Vatech A9

Vatech A9
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
vatech A9 (Model: PHT-30CSS) Installation Manual 65
English
Leveling the Front and Back
1. Place the Spirit Level vertically, as shown in the image.
2. Turn Screws in marked locations left and right until the Sprit Level bubble comes
to the center.
3. When leveling the equipment is completed, ensure to tighten all eight Screws
until they no longer move.

Table of Contents

Other manuals for Vatech A9

Related product manuals