EasyManua.ls Logo

Vector Revolution 180 - Page 4

Vector Revolution 180
151 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
_______________________________________
3
Contents .
CHAPTERS
4 Transport, offloading, setting up
4.1 General instructions 4 - 1
4.2 Space requirement 4 - 1
4.3 Setting up area 4 - 1
4.4 Sensitivity 4 - 1
4.5 Ambient conditions 4 - 1
4.6 Transport routes 4 - 1
4.7 Interim storage 4 - 2
4.8 Cleaning 4 - 2
4.9 Transport from packaging to location 4 - 2
4.9.1 Transport means 4 - 2
4.9.2 Offloading 4 - 2
4.9.3 Levelling 4 - 6
5 Assembly
5.1 General instructions 5 - 1
5.2 Machine Assembly 5 - 1
5.2.1 Re-fitting of components removed for transportation 5 - 1
5.2.1.1 Fitting of X-Axis drive motor 5 - 1
5.2.1.2 Fitting of rear X Axis cable chain and support 5 - 3
5.2.1.3 Fitting and tensioning of X Axis drive belt 5 - 5
5.2.1.4 Fitting and tensioning of Y Axis drive belt 5 - 6
5.2.1.5 Fitting X Axis counter 5 - 8
5.2.1.6 Fitting X Axis +ve and X Axis –ve limit switches 5 - 9
5.2.1.7 Fitting emergency stop pullwire 5 – 10
5.2.1.8 Fitting edgeband coil support 5 - 11
5.2.2 Removing the axis transport brackets 5 – 13
5.3 Machine connections 5 – 14
5.3.1 Electrical 5 – 14
5.3.1.1 Cross section of connection cabling and input pre-fusing 5 – 14
5.3.2 Pneumatic 5 – 14
5.3.3 Testing End-Limit switches 5 – 15
5.3.4 Testing Axis counting direction (X + Y) 5 – 16
5.4 Preparations for no-load tests without workpieces 5 - 17
5.4.1 Mechanical 5 - 17
5.4.2 Electrical (provided by others) 5 – 17
5.4.2.1 Checking the direction of rotation 5 – 18
6 Design and mode of operation
6.1 General description 6 - 1
6.2 Design 6 - 1
6.3 Mode of operation 6 - 2
7 Operation panel
7.1 Control fields / control elements 7 - 1
7.2 Definition of control elements 7 - 1

Table of Contents