25 | Page
Version 00
© Verder Liquids B.V
Ds500, Ds500+ Operating manual
Original instructions (en)
11.2.2 Maintenance schedule
Task Frequency Action
Check pump and cartridge for leaks and
damage
– Before pump start up
– Daily visual inspection
– Scheduled intervals during operation
X Check cartridge connections for any
leaks
X Clean up any spillage.
Check pump for unusual temperatures
or noise in operation
– Daily visual inspection
– Scheduled intervals during operation
X Check pump for damage.
X Replacecartridgeifrequired.
Table 15. - Maintenance schedule