Figure 2-6 System Arrangement
Factory piping
Field piping (by technical personnel)
The following points should be considered before checking out the overall layout diagram:
The single system is used as an example to describe the entire system.
⚫ Vertiv staff and qualified professionals lay out the piping in the laboratory.
⚫ Piping is done by technicians.
Components (marked with *) are not supplied by Vertiv but are recommended for proper circuit operation and
maintenance.
Additional components (marked with +) are required when the equivalent length exceeds 30m.
2.3.2 System Installation Mode
The installation modes of the CR012 unit are shown in Figure 2-7 and Figure 2-8: