5. Cut and remove the cable tie that holds the wiring loop to the blower mounting plate. All other
cable ties that route the fan wiring should remain intact.
6. Remove the six 1/2” hex head screws. Retain the hardware for later use.
Figure 7.1 Lowering EC fans into floor stand, steps 1 through 6
Vertiv | Liebert® DSE™ Installer/User Guide
46