2. Insert the tines of the forklift under the unit.
Make sure the tines are level. The tines must be low enough to fit under the unit without
damaging it.
Make sure the tines extend beyond the opposite side of the unit.
3. Remove the 12 lag bolts and two brackets that secure the unit to the skid.
NOTE: Each lag bolt is 1-1/2" (38mm) long. They can be removed with a 9/16" socket or wrench.
4. Lift the unit to a height that it is not being support by the skid.
5. Move the skid from under the unit.
Figure 2.3 Use a forklift to remove the Liebert XDC from the skid
2.3.4 Removing the Unit from the Skid using Rigging
1. Use the center of gravity indicators on the unit to position the slings. The slings must be
equally spaced on either side of the center of gravity indicator (see Figure 2.4 on the facing
page).
2. Place slings under the unit using spaces provided between the skid deck boards.
NOTE: Unit is shown without outer packaging. These instructions may be applied with the outer
packaging in place.
3. Use spreader bars or an equivalent method to ensure proper protection of the unit.
4. Ensure that the panels, if attached, are well protected from the slings with cushioning material.
NOTE: If rigging is to be used to move the unit closer to the site for installation, place one or two
horizontal straps around the unit and vertical straps at mid height.
5. Remove the 12 lag bolts and two brackets that secure the unit to the skid.
NOTE: Each lag bolt is 1-1/2" (38mm) long. They can be removed with a 9/16" socket or wrench.
Vertiv | Liebert® XDC™ User Manual | 12