Figure 3.4 Piping locations—floor stand and valve assembly
3.1.3 Positioning the Liebert XDC with Floor Stand
Install the Liebert XDC according to the site-specific documentation and secure the unit to the floor.
The Liebert XDC can be installed near a wall or another Liebert XDC. There must be at least 3 feet
(914mm) clearance in front of the Liebert XDC for service access. When the Liebert XDC is combined with
the optional water/glycol floor stand, Vertiv recommends leaving 3 feet (914mm) of clearance on the left
side of the unit.
Vertiv | Liebert® XDC™ User Manual | 20