Liebert XDC 160
Equivalent
Length, ft., (m)
*Hot Gas Line, in. Liquid Line, in.
50 (15) 1-1/8 7/8
100 (30) 1-1/8 1-1/8
150 (45) 1-3/8 1-1/8
200 (60) 1-3/8 1-1/8
* Double risers are required when hot gas vertical rise is 15ft. (4.6m) or more (see Install Double Discharge Risers on page45).
Source: DPN000937, Pg. 3, Rev. 11
Table 4.10
Recommended refrigerant line sizes, DX R-407C, OD copper
Vertiv | Liebert® XDC™ User Manual | 51