EasyManua.ls Logo

Viessmann B2HF - Removing the Boiler from the Pre-Plumbing Jig or Mounting Frame

Viessmann B2HF
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
104
Removing the boiler from the pre-plumbing jig or mounting frame
1.
3.
4.
37
37
2.
Fig. 50
Note
Use new gaskets and, if required, new locking ring
connections when assembling.
Internal gasket diameter:
Gas connection Ø 18.5 mm
Connections on the heating water side Ø 17.0 mm
Gaskets and locking ring connections are available as
spare parts (if required).
Note
When carrying out any work on gas connection fittings,
counterhold with a suitable tool. Never transfer any
forces to the internal components.
Danger
Escaping gas leads to a risk of explosion.
Check all connections on the gas side (also
inside the appliance) for tightness.
Troubleshooting
Repairs (cont.)
5593201
Diagnosis

Table of Contents

Related product manuals