EasyManua.ls Logo

Viessmann B2HF - Commissioning, inspection, maintenance; Steps - commissioning, inspection and maintenance

Viessmann B2HF
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Commissioning steps
Inspection steps
Maintenance steps Page
1. Commissioning the system with the commissioning assistant.................................... 37
2. Filling the heating system................................................................................................. 41
3. Topping up the heating water........................................................................................... 43
4. Checking all connections on the heating water and DHW sides for leaks................... 43
5. Venting the heating system............................................................................................... 43
6. Naming the heating circuits.............................................................................................. 44
7. Entering contact details of heating contractor................................................................ 44
8. Checking the gas type....................................................................................................... 44
9. Converting the gas type for operation with LPG............................................................. 44
10. Removing the front panel.................................................................................................. 45
11. Moving the programming unit to the maintenance position.......................................... 46
12. Checking the static pressure and supply pressure........................................................ 46
13. Function sequence and possible faults........................................................................... 48
14. Setting the max. heating output........................................................................................ 49
15. Adjusting the pump rate of the integral circulation pump............................................. 50
16. Activating screed drying................................................................................................... 51
17. Leak test on balanced flue system (annular gap check)................................................ 52
18. Removing the burner......................................................................................................... 52
19. Checking the burner gasket and burner gauze assembly.............................................. 54
20. Checking and adjusting the ignition and ionisation electrodes.................................... 55
21. Checking the back draught safety devices...................................................................... 55
22. Cleaning the heating surfaces.......................................................................................... 56
23. Checking the condensate drain and cleaning the trap................................................... 56
24. Installing the burner........................................................................................................... 58
25. Checking the neutralising system (if installed)
26. Checking the flow limiter (only for gas condensing combi boiler)............................... 59
27. Checking the expansion vessel and system pressure................................................... 59
28. Checking the safety valve function
29. Checking the electrical connections for firm seating
30. Checking all gas equipment for leaks at operating pressure........................................ 60
31. Fitting the front panel........................................................................................................ 60
32. Checking the combustion quality..................................................................................... 60
33. Checking the flue system for unrestricted flow and leaks
34. Checking the external LPG safety valve (if installed)
35. Matching the control unit to the heating system............................................................ 62
36. Adjusting heating curves.................................................................................................. 62
37. Calling up and resetting the maintenance display.......................................................... 62
38. Instructing the system user.............................................................................................. 63
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5593201

Table of Contents

Related product manuals