Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Commissioning the system with the commissioning assistant.................................... 37
• •
2. Filling the heating system................................................................................................. 41
•
3. Topping up the heating water........................................................................................... 43
• • •
4. Checking all connections on the heating water and DHW sides for leaks................... 43
•
5. Venting the heating system............................................................................................... 43
•
6. Naming the heating circuits.............................................................................................. 44
•
7. Entering contact details of heating contractor................................................................ 44
•
8. Checking the gas type....................................................................................................... 44
•
9. Converting the gas type for operation with LPG............................................................. 44
• • •
10. Removing the front panel.................................................................................................. 45
•
11. Moving the programming unit to the maintenance position.......................................... 46
• • •
12. Checking the static pressure and supply pressure........................................................ 46
•
13. Function sequence and possible faults........................................................................... 48
•
14. Setting the max. heating output........................................................................................ 49
•
15. Adjusting the pump rate of the integral circulation pump............................................. 50
•
16. Activating screed drying................................................................................................... 51
•
17. Leak test on balanced flue system (annular gap check)................................................ 52
•
18. Removing the burner......................................................................................................... 52
• •
19. Checking the burner gasket and burner gauze assembly.............................................. 54
• •
20. Checking and adjusting the ignition and ionisation electrodes.................................... 55
• •
21. Checking the back draught safety devices...................................................................... 55
•
22. Cleaning the heating surfaces.......................................................................................... 56
• •
23. Checking the condensate drain and cleaning the trap................................................... 56
• •
24. Installing the burner........................................................................................................... 58
• •
25. Checking the neutralising system (if installed)
•
26. Checking the flow limiter (only for gas condensing combi boiler)............................... 59
• • •
27. Checking the expansion vessel and system pressure................................................... 59
• • •
28. Checking the safety valve function
• • •
29. Checking the electrical connections for firm seating
• • •
30. Checking all gas equipment for leaks at operating pressure........................................ 60
• • •
31. Fitting the front panel........................................................................................................ 60
• •
32. Checking the combustion quality..................................................................................... 60
• • •
33. Checking the flue system for unrestricted flow and leaks
• • •
34. Checking the external LPG safety valve (if installed)
•
35. Matching the control unit to the heating system............................................................ 62
•
36. Adjusting heating curves.................................................................................................. 62
•
37. Calling up and resetting the maintenance display.......................................................... 62
•
38. Instructing the system user.............................................................................................. 63
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance