Note
During screed drying, DHW heating is not available.
Observe EN 1264. The report to be provided by the
heating contractor must contain the following details
regarding heat-up:
Heat-up data with the relevant set flow temperatures
Max. flow temperature achieved.
Operating state and outside temperature at handover
Different temperature profiles can be set via parameter
897.0.
Note
Temperature profile 6 ends after 21 days.
The function continues after a power failure or after the
control unit has been switched off. When screed drying
has completed or been manually switched off, the sys-
tem is regulated in accordance with the selected
parameters.
Parameter 897.0 "Screed drying":
Temperature profile 1 (EN 1264-4)
Flow
temperature °C
1 5 10 15 20 25 30
Days
50
40
30
20
10
Fig. 62
Temperature profile 2 (ZV parquet and flooring technology)
Flow
temperature °C
Days
50
40
30
20
10
1 5 10 15 20 25 30
Fig. 63
Temperature profile 3
Flow
temperature °C
Days
50
40
30
20
10
1 5 10 15 20 25 30
Fig. 64
Temperature profile 4
Flow
temperature °C
Days
50
40
30
20
10
1 5 10 15 20 25 30
Fig. 65
Function description
Appliance functions (cont.)
5593201
Functions

Table of Contents

Related product manuals