Manual VIPA System 300V Chapter 6 Deployment CPU 31x with TCP/IP
HB130E - CPU - Rev. 11/50 6-13
Hardware configuration
Precondition: SIMATIC manager from Siemens V. 5.1 or V.5.2 with SP1
and SIMATIC NET
Start the SIMATIC manager from Siemens with a new project.
Add a new System300 station via Insert > Station > SIMATIC 300-
Station.
Activate the station "SIMATIC 300" and open the hardware configurator
by clicking on "Hardware".
Configure a rack (Simatic300 > Rack-300 > Profile rail).
For all CPUs 31x from VIPA are configured as CPU 315-2DP, you select
the CPU 315-2DP with the order no. 6ES7 315-2AF03-0AB0 in the
hardware catalog.
This is to find under Simatic300 > CPU-300 > CPU 315-2 DP.
Place your modules starting at plug-in location 4. After that place your
virtual CP343-1 TCP(Simatic300 > CP-300 > Industrial Ethernet > CP
343-1 TCP).
If needed parameterize the CPU res. the modules. The parameter
window is opened at double click on the depending module.
Via a double click on the CP 343-1 TCP you open the properties window
and you type that IP address and that Subnet mask into properties that
you have defined in WinNCS.
Save your project.
The transfer of the hardware configuration happens together with the user
application.
User application
Create a communication channel between CPU and CP by means of the
SYNCHRON block.
Program the according SEND and RECEIVE blocks for initializing send
and receive orders.
Program the blocks SEND_ALL res. RECV_ALL for data transfer.
Transfer of user application and hardware configuration
To transfer your user application and the hardware configuration you have
the following possibilities:
Transfer via MPI respectively Profibus
Transfer via MMC
Transfer via Ethernet
Details about project transfer can be found at chapter "Deployment CPU
31x" at "Project transfer".
Here the fast introduction ends. The following pages contain a detailed
description of the project engineering.