Before Installation
4 Before Installation
This installation guide provides you with installation directives and procedures for the installation of
TRAILERCAST with Battery.
4.1 Liability
Service Partner or by the customer (after ZF training/demo installation). Contact your service partner in
case the iABS/RSSplus data still needs to be activated.
Many customers prefer to do the installation themselves: the building-in of the device can then be combined
purpose, ZF provides training for the technical engineers of the installation company. The training consists
of a theoretical part which can be illustrated with a demo installation, and further monitoring. Afterwards, the
been found correct at the time this manual was composed. However, ZF cannot accept any responsibility
for possible adaptations by the manufacturer concerned. ZF aims for a continuous improvement of its
products. For the purpose of technical progress, we reserve the right to implement changes at any time,
without prior notice.
4.2 Approvals
4.2.1 FCC Approval
the US Federal Regulations.
4.2.2 CE Approval
the RED directive.
4.2.3 Mobile Phone Radiance
FREQUENCY RF OUTPUT POWER
LTE-FDD B1/B2/B3/B4/B5/B8/B12/B13/B18/B19/B20/B26/B28 23 dBm ± 2 dB (class 3)
LTE-TDD B39 (for Category M1 only) 23 dBm ± 2 dB (class 3)
GSM850 / EGSM900 33 dBm ± 2 dB
DCS1800 / PCS1900 30 dBm ± 2 dB