EasyManua.ls Logo

Wacker Neuson 0620320

Wacker Neuson 0620320
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly & Assembly RD 12/RD 12A
wc_tx000671gb.fm 110
9.30 Installing the Steering Valve
Prerequisites Machine OFF and engine cool
Procedure Follow the procedure below to install the steering valve.
1. Position the steering valve (j) and bracket (h) into the control console. Secure the steer-
ing valve to the bracket with screws (i) .
2. Secure the bracket (h) to the console with the screws (g).
3. Connect the hydraulic lines (f).
4. Install the choke control (e).
This procedure continues on the next page.
wc_gr004240
g
i
h
h
g
j
wc_gr004241
e
f

Table of Contents

Related product manuals