2-2 Installing the System
Setting up and inspecting
PrepLC system
The main components of the PrepLC system arrive in three cartons, which
together contain the following:
• PrepLC controller (electronics unit)
• Fluid handling unit and Startup Kit
• Shelf unit with injector panel
• Rheodyne 7725i injector, when purchased separately
•Gradient mixer
Accessories such as columns, integrators, detectors, etc. are packed
separately.
Delta-Prep system
The main components of the Delta-Prep system arrive in four cartons, which
together contain the following:
• PrepLC controller (electronics unit)
• Fluid handling unit and Startup Kit
• Shelf unit
• Delta-Prep system rack with column clamps and injector valves
Accessories such as columns, integrators, detectors, etc. are packed
separately.
Unpacking and installing the system
1. Open the cartons, checking the contents of each against the packing slip
to confirm it contains its full complement of items.
2. Remove the system components from their respective cartons, and place
them at the installation site.
3. Inspect all items for shipping damage. Immediately report any damage
to both the shipping company and your Waters Technical Service
representative.