EasyManua.ls Logo

Weber mt CF 4 - Maintenance Survey; Initial Maintenance

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CF-4 25
3.2 Maintenance Survey
Any maintenance work which must be performed on the soil compactor is listed in two charts. The first chart
(paragraph 3.2.1) indicates the initial maintenance work which has to be carried out once at a certain time after
commissioning. The routine maintenance work indicated in the second chart (paragraph 3.2.2) has to be repeated
at regular intervals.
Both charts have the same lay-out. The column "Maintenance Interval" indicates the time or the operating hours at
which (after which) the maintenance work must be done.
The column "Maintenance Item" refers to the assembly group on which the work indicated in the column "Maintenance
Work" must be carried out.
The column "Remarks" contains cross-references on paragraphs of these operating and maintenance instructions or
other documentation in which the maintenance work is described in detail.
3.2.1 Initial Maintenance
Maintenance Interval Maintenance Item Maintenance Work Remarks
After the first 10 operating
hours
Vibrator -
Check the V-belt's tension, if
required, increase the tension
# 3.3.4/5
After the first 20 operating
hours
Engine - Change the engine oil
# 3.3.1
Vibrator - Change the oil
# 3.3.6
Whole machine - Check all screwed
connections for tight seat,
retighten them if necessary
RAMIRENT

Related product manuals