EasyManua.ls Logo

Wega Espresso Coffee Machine - Venus Machine Maintenance; Heating Element Replacement; Hot Water Solenoid Valve Replacement

Wega Espresso Coffee Machine
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMC
4
English
espresso coffee machine -
machine diagrams
R
1 VENUS machine
1.1 REPLACEMENT of the HEATING ELEMENT or of the HEATING ELEMENT PROTECTION
1) Completely loosen the screw (A) located on the left-hand side of the body (B)
2) Remove the left hand side of the body (B) following the profile of the steam nozzle
3) After working on the heating element or heating element protection, put the body panel (B) back in place and tighten the screw (A)
1.2 REPLACEMENT of the HOT WATER SOLENOID VALVE
1) Completely loosen the screw (A) located on the right-hand side of the body (B)
2) Remove the right-hand side of the body (B) following the profile of the steam nozzle
3) After working on the solenoid valve, put the body panel (B) back in place and tighten the screw (A)
A
B
B
A
B
B

Table of Contents

Other manuals for Wega Espresso Coffee Machine

Related product manuals