EasyManua.ls Logo

Wega Espresso Coffee Machine - Control Unit and Related Components Maintenance

Wega Espresso Coffee Machine
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
SMC
5
espresso coffee machine -
machine diagrams
R
1.3 WORKING on the CONTROL UNIT, PRESSURE SWITCH, DOSING DEVICES, or CUP HEATER THERMOSTAT
1) Remove the lower grilles and the drain tub (A)
2) Loosen the screws (B) and remove the protection (C)
3) Loosen the screws (D) located on the base of the support covers of the boiler
4) Loosen the screws (E) and remove the rear cover of the base (F) by sliding it outwards
5) After work is complete, put the body components back in place by following the procedure in reverse order
B
A
B
C
D
D
F
E

Table of Contents

Other manuals for Wega Espresso Coffee Machine

Related product manuals