EasyManua.ls Logo

WEIHONG NK300CX - Page 40

WEIHONG NK300CX
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
上海维宏电子科技股份有限公司
SHANGHAI WEIHONG ELECTRONIC TECHNOLOGY CO., LTD
40 / 53
3. Do one of the following according to the actual situation:
If it is the first time to execute calibration, pressF1. The system starts to
execute first calibration and automatically records current Z-axis
machine coordinate.
After tool change or tool break, press F2. The system starts to execute
calibration after tool changed and automatically recovers Z-axis
workpiece coordinate of the current point.
Note: Calibration after tool changed must be executed after completion of first-time calibration.
The system automatically records the calibration results into the tool offset:
First-time calibration
Calibration after tool changed

Other manuals for WEIHONG NK300CX

Related product manuals