EasyManua.ls Logo

Wolf BWL-1 S - Page 104

Wolf BWL-1 S
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
104 3064298_201507
53.1.3
Dismantling of heat pump and
disposal of refrigerant
53.1.2
Compulsory documentation
All work carried out on a heat pump, e.g. maintenance, repair and leak tests, must be
documentedandtherecordofresultsmustberetainedforveyears.
This obligation applies to the operator and the company carrying out the work.
The heat pump must only be dismantled and the refrigerant contained in it must only
bedisposedofbycertiedcontractors/refrigerationengineersinaccordancewith
EC 842/2006, 303/2008 and 517/2014.
The following data must be entered:
f Details of all repair and maintenance work
f Typeofrefrigerantlledintothesystem(new,re-usedorrecycled)andthe
quantity of refrigerant removed from the system
f If an analysis of a re-used refrigerant is available, the results must also be
documented in the system report.
f The origin of the re-used refrigerant
f Systemmodicationsandreplacedcomponents
f Results of all regular routine tests
f Prolonged shutdowns
53. System log book

Table of Contents

Related product manuals