36
3062547_201507
In the vertical part of the ue, a cleaning and inspection aperture is required
immediately above or below the ue diverter if the distance from the centre of the
cleaning and inspection aperture in the horizontal part of the ue to the vertical axis
of the ue is greater than 30 cm.
The distance can be up to 1 m if the inspection aperture in the horizontal part of the
ue is arranged on the front and if there are no diverters in the ue from this cleaning
and inspection aperture to the vertical part.
In the upper part of the ue arranged inside the building (< 5 m), a cleaning and
inspection aperture is required if cleaning or inspection cannot be carried out from the
roof.
Before commissioning the combustion system, have the safe usability of the ue
system conrmed by the local ue gas inspector [in Germany; check local regulations].
Installingtheue
23. Cascade operation
Flue gas header design / notes
26
16
23
24
25
1 Oil condensing boiler
2 Connection adaptor with test nipple
for air and ue gas (included in COB standard delivery)
16 Rose
23 Support rail
24 87° support bend
25 Spacer
26 PP pipe
27 Cowl
33 PP outlet
34 Electricaluegasdamper
35 Extension(whererequired)
36 Siphon
37 PP header
38 End piece with inspection aperture and condensate
drain
Secondary
ventilation
Example of an open ue cascade design according to type B23
1 1 11