VerticalconcentricbalancedueC33x(examples)systemDN80/125andDN110/160
1 Oil condensing boiler
2 Connection adaptor with test nipple
for air and ue gas (included in COB
standard delivery)
3 Balancedueincl.inspectionaperture
(250 mm long)
4 BalancedueDN80/125
500 mm
1000 mm
2000 mm
5 Spacer clip
6 Mounting bracket
for roof outlet
7 Balancedue,vertical
(roof outlet for at
or pitched roofs)
8 Separator
(slide coupling), if required
9 45° bend
10 Inspectiontee,87°
11 87° bend
12 Universaltilefor
pitched roof 25° - 45°
13 "Klöber" adaptor 20° - 50°
14 Flat roof collar
Please note: Install the horizontal ue with approx. 3° fall (6 cm/m) towards
the boiler. During installation, slide the separator (8) fully
into the coupling. Push the next balanced ue (4) 50 mm
(dim. "S") into the coupling of the separator, and secure in
this location, e.g. with pipe clips DN 125 (5) or a xing screw
on the air side.
Lubricate the pipe ends and gaskets for easier installation
(use only grease without silicone).
Determine the required inspection piece (3) (10) with your
local ue gas inspector prior to installation.
NB
C33x C33xC33x
31. Design information