EasyManua.ls Logo

Xinje VH5 Series - Page 39

Xinje VH5 Series
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
4)Add Group U parameters to the PDO.
After adding a node, select the node with the cursor to display the current node PDO configuration. Select “Edit
PDO mapping settings”. The pop-up interface displays the current output PDO mapping on the left and PDO
entries on the right. You can add or delete PDO as required.
To add a PDO, select Add PDO entry”, and the PDO object that can be added will be displayed in the pop-up
window. Select it, click OK, and then click apply to add it successfully.
After adding, see the following figure:
5)Gateway communication settings
First, check the IP address of the PLC: in the multi view browser, select Controller settings→Bulit-in Ethernet/IP

Related product manuals