EasyManua.ls Logo

Xylem Aquavar IPC - Control Wiring; Single-Pump Control Wiring

Xylem Aquavar IPC
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 9
Aquavar IPC Start-Up Genie
Xylem
Install Jumper wires on:
Terminal 12 and 18
The IPC requires a start command on
terminal 18. To apply a start signal connect
a jumper wire between terminals 18 (DI 18,
parameter 5-10) and 12 (24V dc). A start
command is given to the controller when
terminal 18 is connected to 24V.
Install Transducer cable on:
Brown on terminal 12 (24V)
White on terminal 53 (4-20MA)
Place ground shield between spring clip
and shielded cable.
4. CONTROL WIRING
4.1 SINGLE-PUMP CONTROL WIRING

Other manuals for Xylem Aquavar IPC

Related product manuals