EasyManua.ls Logo

Yamaha F80 - Page 98

Yamaha F80
497 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-35
Outboard Rigging Guide - 2001 Dual Engine Tie Bar Kit Installation
22. Detach the port rod terminal and thread it on
the tie rod to the proper toe-out position.
NOTE: The end of the rod should be between
the two holes on the rod terminal.
Adjustments can be made to insure proper toe-out
position.
23. Re-attach the rod terminal to the port engine
swivel clevis and tighten nut to 12 ft-lb.
Recheck all nuts and bolts to assure proper
installation and torque.
After 2 hours of operation, recheck all bolts
and nuts to assure proper installation and
torque.
At the end of every 50 hours of operation, re-
lube, inspect all parts for wear, proper instal-
lation, and torque.
WARNING

Table of Contents

Other manuals for Yamaha F80

Related product manuals