2-22
CABLE ROUTING
1 Rubber cover
2 U
pper cover
3 Head
light assembly lead
4 M
eter assembly lead
5 Left
handlebar switch leads and couplers
6 Clut
ch switch lead and coupler
7 Aux
iliary light lead
8 Righ
t handlebar switch leads and couplers
9 Mai
n switch lead
0 F
ront turn signal light leads
È Rubber cover shall be inserted into upper cover.
É Insert the hang shape into hole of upper
cover (left & right).
Ê Edge of rubber cover shall be at outside
e
dge of upper cover.
Ë
Layout of leads under rubber cover shall be in
random order.
Ì Insert part of rubber cover.
Í Insert part of rubber cover shall be inserted
into hole of rubber cover, position of insert part
of rubber cover shall be towards rear side (left &
right).
Î Slit shall be on right side of the vehicle.
Ï Pass the meter assembly leads through hole of
rubber cover.
B9X-F8197-E0.book Page 22 Thursday, July 16, 2020 2:28 PM