EasyManua.ls Logo

YASKAWA iQpump Micro

YASKAWA iQpump Micro
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
YASKAWA TOEP YAIQPM 01A iQpump Micro Quick Start Procedure
iQpump Micro
Quick Start Procedure
Page 5
of 31
3.1 Verify installation environment.
Mechanical installation and mounting footprint vary by model. Refer to the iQpump Micro User Manual No. TOEP YAIQPM 03,
Chapter 2: Mechanical Installation for details. Ensure the installation conditions are suitable to prolong and optimize performance
life.
Environment Conditions
Installation Area Indoors
Ambient Temperature -10 to + 40 °C (+14 to +104 °F) NEMA 1, UL Type 1 Enclosure
Humidity 95% RH or less and free of condensation
Storage Temperature -20 °C to +60 °C (-4 °F to +104 °F)
Surrounding Area Install the drive in an area free from:
oil mist and dust
metal shavings, oil, water, or other foreign materials
• radioactive materials
combustible materials (e.g., wood)
harmful gases and liquids
• excessive vibration
• chlorides
• direct sunlight.
Altitude Up to 1000 meters without derating. Up to 3000 meters with output current and voltage derating
Orientation Install the unit vertically to maintain maximum cooling effects.
3.2 Maintain installation clearances.
AA
B
C
C
Top/Bottom Clearance
Side Clearance
2 mm
A
B
B
C
D
C
Multiple Drive Installation
Single Drive Installation
Install Type
Minimum Spacing
AB C D
Single drive
30 mm (1.18 in)
• Air ow
direction
100 mm (3.93 in) -
Multiple drive
installation
Align the tops of
the units
30 mm (1.18 in) 100 mm (3.93 in) Air ow direction
Ensure the back panel is placed against a closed at
surface for proper cooling.
NOTICE: Abnormal Operation. Avoid placing peripheral
devices, transformers, or other electronics near the
bypass as the noise created can lead to abnormal
operation. Take proper steps to shield the bypass from
electrical interference if such devices must be used in
close proximity to the Bypass.
NOTICE: Equipment Damage. Prevent foreign matter
such as metal shavings and wire clippings from falling
into the bypass during installation. Failure to comply could
result in damage to the bypass. Place a temporary cover
over the top of the drive during installation. Remove the
temporary cover before bypass start-up, as the cover will
reduce ventilation and cause the bypass to overheat.
Perform Mechanical Installation
3
STEP

Other manuals for YASKAWA iQpump Micro

Related product manuals