EasyManua.ls Logo

3M Steri-Vac GS Series - 12.14.1. Unloading the 3 M Steri-Vac Sterilizer;Aerator GS Series - Cycle Complete

3M Steri-Vac GS Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
12.8.1. Unloading the 3M™Steri-Vac™ Sterilizer/Aerator GS Series – CycleComplete
Sterilizer
55.0
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:04:01
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle: Count:3355
˚
C
Open door Show chart
Figure57.
Cycle CompleteScreen
1. Press the Open Door button on the touch screen (Figure57). On double door units, press the Open Unload Doorbutton. The Load Door cannot be opened after the cycle has successfully
completed on double door units.
2. Allow chamber pressure to equilibrate to room pressure; this typically requires 60-90seconds.
3. Open the GS Series sterilizerdoor.
4. Remove the load from the chamber. Remove the empty 3M™ Steri-Gas™ EO GasCartridge.
5. Press the Stop button to generate a printout of the cycle report (Figure58). The display will return to the mainscreen.
6. Follow the Process Monitoring and Quality Control procedures described in Chapter13.
Sterilizer
22.2
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:03:12
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle: Count:3355
˚
C
Open door Show chart
Press Stop to Obtain a
Printout CycleReport
Figure58.
Command to Obtain Cycle
ReportP
rintout

Table of Contents

Other manuals for 3M Steri-Vac GS Series

Related product manuals