Planning
38
Planning Aastra 400 DECT systems as of R1.0
syd-0457/1.0 – R1.0 – 10.2012
5. 3. 2. 1 Global coverage in the supply range
First, ensure that the surface area of the planned supply range is satisfactorily cov-
ered.
The ideal locations for the radio units are determined using practical measure-
ments.
Fig. 16 Global coverage in the supply range
80 m
30 m
Oce building
Factory
Required supply range
Weather-proof installation