Planning
39
Planning Aastra 400 DECT systems as of R1.0
syd-0457/1.0 – R1.0 – 10.2012
5. 3. 2. 2 Handover overlap areas
• To guarantee a clean handover, the radio units should be fitted in such a way
that the 35–40 dBμV limits are at least in contact.
• When conducting survey measurements in unfinished buildings, the limits
should be increased by 10 dBμV.
Fig. 17 Planning handover overlap areas
How to evaluate the field strength measurement values and specify the overlap ar-
eas is described in "Measuring", page 44.
Aastra Intelligent Net:
Handover is not supported in an AIN with radio units on various nodes,
whose coverage areas overlap each other, since both systems are not run-
ning synchronously. This also applies to PINX in a PISN.