Installation
52
Fix the lead-through plate to the floor:
1. Make a hole in the floor or cable conduit cover below the lead-through plate. See Dimensional
drawings.
2. Check that the floor is horizontal with a spirit level.
3. Fasten the lead-through plate with screws or bolts.
Note: The screws/bolts will be removed and refastened when the pedestal is fastened through the
same holes later on. The lead-through plate can be fastened after leading the cables through it if
the cabling procedure is more convenient in that way.
Lead the power (input, motor and optional brake) cables through the lead-through plate:
1. Make adequate holes in the grommets to fit them tightly on the cables.
2. Lead the cables through the holes and slide the grommets onto the cables.
These brackets can be removed for
the time of the installation
Frame size R7
Frame size R8
W1
W2
Busbars connecting the
power cable terminals to
the drive module
W1
V1
U1
R-
PE
W2
V2
U2
UDC+
UDC-
R+
a
floor fixing points
a
a
PE
ProE: 64564439
a
a
V1
U1
V2
U2
UDC+
R+
UDC-
R-
ProE: 64524739