Preparing for installation 25
Gathering the installation tools
Once you have finished planning your installation, you need to assemble a set of all the equipment
necessary to perform the installation.
Supplied tools
• Metric hex (Allen) key set: 2.5 mm, 4 mm, 5 mm
•
Spare parts
The following is included with the monitoring system:
•
Recommended tools (not provided)
• 50.8 mm (2.0 in) wrench, or adjustable wrench
• 13 mm (½ in) wrench, or adjustable wrench
• 8 mm (0.3 in) wrench, or adjustable wrench
•
• Torque wrench
• Flat head screwdriver
• Drill and drill bits
• Bolt inserts
• Roll of Teflon (PTFE) tape
• Bucket and rags
• Level
• Wire stripper and wire cutter
• Laptop with a web browser (for sensor commissioning) (the latest version of Chrome, Firefox,
Internet Explorer and Safari is recommended)
• Straight RJ45 Ethernet cable (for sensor commissioning)
• Optical termination equipment (if installing the optional optical Ethernet port)
• Transformer valve adapter (when applicable)
Personal protection equipment
• Hard hat
• Safety shoes
• Gloves
• Protective glasses