50 Installation Guide
Connecting the cable
NOTICE
All terminals are properly identified in the instrument itself to simplify installation.
1 Of the cables coming from the sensor head conduit, identify the one with green, blue and brown
internal wires. This is the AC power cable.
Figure 30 Sensor head AC power cable configuration
LINE
NEUTRAL
EARTH
HU Live
HU Neutral
Earth
2 Route the wire under the cable guides found at the bottom and on the left-hand side of the
analytical unit cabinet (see Figure 31 on page 50.)
Figure 31 Routing the sensor head AC power cable
Protection rail
top cover
Cable guides
NOTICE
Once the installation is complete, it is strongly suggested to use tie wraps (in white on
Figure 31) to secure the cables to the cable guides.
3 Remove the protection rail top cover (see Figure 31) and continue routing the wire through the upper
protection rail all the way to the appropriate terminal, as illustrated in Figure 32.