APPENDIX A
Physical installation checklist
The system date is set properly using the CoreSense™ M10 web interface.
The thermal pump is enabled (see “Activating the thermal pump” on page 69). While the thermal
pump is disabled, the SYSTEM LED is yellow.
Visual inspection of the installation (oil leaks).
Cable glands are tight and secure.
The sensor head and analytical unit are properly grounded.
Teflon (PTFE) tape was applied on the 1.5 NPT fitting, as per “Installing the sensor head” on
page 35?
The proper torque was applied to secure the eight bolts on the sensor head rotating flange, as
described in “Installing the sensor head” on page 35.
The two bolts for the sensor head external sampling cover are secure.
The five retaining screws of the CoreSense enclosure are properly secured.
The SYSTEM, GAS, and MOISTURE LEDs are green at the back of the sensor head.
The green LED is lit on the analysis unit.
Dispose of any collected oil according to company regulations and local laws.