4.2 Unpacking................................................................................................................................. 55
4.2.1 Unpacking procedure.............................................................................................55
4.2.2 Do a check of the transport sensors...................................................................56
5 Installation..........................................................................................57
5.1 General installation procedure..............................................................................................57
5.2 Site preparation....................................................................................................................... 57
5.2.1 Prepare the site........................................................................................................57
5.2.2 Control the space and airflow around the cabinet...........................................58
5.3 Prepare the foundation.......................................................................................................... 58
5.3.1 Prepare the foundation - general procedure.....................................................58
5.3.2 Prepare a standard prefabricated foundation.................................................. 59
5.3.3 Prepare a cast foundation..................................................................................... 59
5.4 Detach the cabinet and base................................................................................................ 59
5.4.1 Detach the cabinet (Terra 360)............................................................................ 59
5.4.2 Detach the cabinet (Terra 180 and 60)...............................................................60
5.4.3 Detach the base.......................................................................................................61
5.5 Prepare the cables...................................................................................................................62
5.5.1 Cable installation procedure.................................................................................62
5.5.2 Open the cable glands (Terra 360)...................................................................... 62
5.5.3 Open the cable glands (Terra 60 and 180)......................................................... 63
5.5.4 Guide the cables through the opening in the cable guide plate................... 63
5.5.5 Install the base on the foundation...................................................................... 64
5.5.6 Cut the cables to the correct length................................................................... 64
5.6 Mechanical installation...........................................................................................................65
5.6.1 Mechanical installation procedure.......................................................................65
5.6.2 Install the cabinet on the base.............................................................................65
5.6.3 Connect the cabinet to the base......................................................................... 66
5.7 Electrical installation.............................................................................................................. 66
5.7.1 Electrical installation procedure.......................................................................... 66
5.7.2 Connect the wires of the AC input cable (Terra 360)....................................... 67
5.7.3 Connect the wires of the AC input cable (Terra 180).......................................68
5.7.4 Connect the wires of the AC input cable (Terra 60).........................................69
5.7.5 Connect the PE wire (Terra 360)...........................................................................71
5.7.6 Connect the PE wire (Terra 180 and 60)............................................................. 72
5.7.7 Connect the Ethernet cable (Terra 360)............................................................. 73
5.7.8 Connect the Ethernet cable (Terra 180)..............................................................73
5.7.9 Connect the Ethernet cable (Terra 180)..............................................................74
5.8 Tilt sensors installation (option).......................................................................................... 75
5.8.1 General procedure...................................................................................................75
5.8.2 Install the bracket of the tilt sensors.................................................................. 76
5.8.3 Install the tilt sensors.............................................................................................76
5.8.4 Connect the tilt sensors.........................................................................................77
5.9 Prepare for commissioning....................................................................................................77
Contents
9AKK108467A6398-EN | 002 5