EasyManua.ls Logo

abem Terrameter LS - Induced Polarisation (IP)

abem Terrameter LS
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABEM Terrameter LS
93
11.3 Induced Polarisation (IP)
In the case of time domain IP measuring one positive and one negative current pulse
is usually employed. It is then necessary to measure the background levels before and
after the measuring cycle, and use that for removing drift during the measuring cycle.
Failure to do so can lead to magnitude higher measurement errors in the measured
resistivity data. (Figure 107)
Period
Current
Voltage
Measuring intervals
Figure 107. IP measuring cycle timing definitions

Table of Contents

Other manuals for abem Terrameter LS

Related product manuals