EasyManua.ls Logo

Agilent Technologies 8890 - Page 52

Agilent Technologies 8890
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 Installing the GC
52 Installation and First Startup
Procedure
1 Locate the input fitting for inlet coolant on the rear of the GC. Prepare enough tubing to
reach from the supply to this outlet.
2 Connect the supply tubing to the air supply outlet with the fitting recommended by the
supplier.
3 Use a Swagelok fitting to connect the supply tubing to the cryogenic valve input fitting.

Table of Contents

Other manuals for Agilent Technologies 8890

Related product manuals