EasyManuals Logo

Allen-Bradley PLC-2/30 User Manual

Allen-Bradley PLC-2/30
348 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #149 background imageLoading...
Page #149 background image
Output Override and I/O Update Instructions
Chapter 7
76
The Immediate Output instruction updates one module group with data
from one output image table word ahead of the normal scan sequence
(Figure 7.4).
The Immediate Output instruction is programmed as an output instruction
in the ladder diagram rung. This instruction is executed when rung
conditions allow logic continuity. Unconditional programming can also be
used to cause the module group to be updated during each program scan.
Program the Immediate Output instruction only when necessary. This
depends on the response time of output modules and devices, and on the
position of the rungs addressing the module group.
The Immediate Output instruction should be programmed just after the
rungs that control the bits in the addressed output image table word.
In programmable controller applications, this instruction only gives a slight
advantage when entered near the end of the program scan, since output
data will soon be updated in the I/O scan. This instruction is best applied
when entered near the middle of the user program.
7.2.3
Immediate Output
Instruction
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allen-Bradley PLC-2/30 and is the answer not in the manual?

Allen-Bradley PLC-2/30 Specifications

General IconGeneral
BrandAllen-Bradley
ModelPLC-2/30
CategoryController
LanguageEnglish

Related product manuals