Rockwell Automation Publication 6000-IN100A-EN-P - August 2020 43
Chapter 2 Drive Electrical Installation
Figure 21 - Control Power Wiring Opening, A-Frame
Figure 22 - Control Power Wiring Opening, B-Frame
The control power wiring terminates to the VFD1 terminal block strip on the
left side of the LV Control cabinet (Figure 23
).
Cable entrance in top
of LV Control Cabinet
Wire duct for
bundling cable
Bracket for
bundling cable
Cable entrance in bottom
of LV Control Cabinet
Cable entrance in
top or bottom front
of LV Control Cabinet