4 Rockwell Automation Publication 750-IN020D-EN-P - May 2017
PowerFlex 755 IP00, NEMA/UL Open Type Drive
Overview
Selecting and Integrating an IP00 System
The following steps will guide you in planning and installing a PowerFlex 755
IP00, NEMA/UL Open Type drive.
1. Considerations
• Drive size (Hp & V AC), required accessories/options (HIM, comms, etc.)
• Ingress protection of system
• Mounting orientation of drive
• Cooling method, venting orientation, alignment of venting
• Control pod mounting location
• Cabling entry/exit scheme and cable routing provisions
• Roll-out cart required
• Personnel safety and necessary tooling
2. Selection
• Select and purchase enclosure with sub-panel and ingress accessories (page 16)
• Select and purchase drive and corresponding drive options (see 750-TD001
)
• Select and purchase pod and corresponding cables (page 10
or page 14)
• Select and purchase field termination kits (page 10
or page 14)
• Select and purchase appropriate mounting kits (drive mounting & floor - page 10
or page 14
)
• Select and purchase door fans (pages 20
…21)
• Select and purchase necessary wire and cabling (pages 45
& 59)
3. Prepare the Enclosure
• Create ventilation openings, mount door fans (pages 17…21)
• Provisions for accessories (HIM cradle, etc. - see 750-TD001
)
• Fabricate and mount inlet and outlet plenums (pages 17
…19)
• Drill sub-panel(s) (page 39
& page 40)
• Mount field termination kit, mounting brackets, and floor kit (page 39
& page 40)
• Mounting of customer specified accessories
• Remote mounting of control pod (if specified - see 750-IN015
)
• Mount sub-panel(s)
4. Power and Ground Wiring
• Ensure proper grounding (page 45)
• Position & secure movable L-brackets (page 49
)
• Properly terminate power cables (page 48
)
• Attach power cabling (page 48
)
5. Roll-in and Secure the Drive Unit
• Raise drive unit to vertical orientation (page 37)
• Position roll-out cart (see 750-IN001
)
• Lift drive unit onto cart (see 750-IN001
)
• Roll drive unit into cabinet and secure (see 750-IN001
)
6. Control Wiring
• Mount control pod into drive (if specified - page 42)
• Verify control transformer voltage (page 41
)
• Ensure proper cable routing (page 58
)
• Attach pod power and fiber optic cables (page 58
)
• Install real time clock battery and HIM cable (page 60
)
• Install remaining control wiring (pages 59
…66)
• Verify correct torque on all fasteners and connectors
7. Commission the System