4.1 Start-up and Test, continued
4.1.1 AC Line Operation, continued
Use the Smart Display to verify XM2-300HP operations. If desired, the No Battery 5.
6.
4.1.2 Self Test Operation
1.
-
Menu as needed.
2.
be entered by setting Self Test to ON in the Setup Menu.
While in self test mode, use the Smart Display or a true RMS voltmeter to verify 3.
input voltage.
To cancel a self test in progress, push and hold DOWN and ENTER a second 4.
time, or change Self Test to OFF in the Setup Menu.
7.
supply displays Operations Normal. Use the Smart Display to verify operations
and setup as needed.
Setting
Table 4-1, AC Output
33
017-877-B1-001 Rev. A