EasyManua.ls Logo

Amazone FTender 1600 - Page 64

Amazone FTender 1600
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Unfold the filling aid
1
.
7. Fix the filling aid on the filling funnel with the
locking mechanism
2
.
8. Drive the implement towards the outlet of the
transport vehicle.
1
2
CMS-I-00003857
9. To activate the oil supply for the feed auger:
switch on the "red 2" tractor control unit as
required up to a maximum of 75 l/min.
10. Slowly switch on the filling auger's drive on the
stop tap
1
.
11. Fill the filling funnel of the filling auger with the
spreading material.
The fill level in the hopper rises.
NOTE
The maximum filling capacity is reached when a
material cone is formed over the feed auger.
12. Monitor the fill level.
13.
When the hopper is full:
stop filling the filling funnel.
14. Leave the feed auger running until it is empty.
15. Slowly switch off the filling auger drive with the
stop tap.
16. Switch off the "red 2" tractor control unit.
1
CMS-I-00003855
6 | Preparing the machine
Preparing the implement for operation
MG6492-EN-II | P.1 | 21.11.2023 | © AMAZONE
58

Table of Contents