AMETEK CTS  Automotive Transient Immunity Testing 
 
  1.00  6 / 26 
 
Only approved accessories, connectors, adapters, etc. are to be used to ensure safe operation. 
 
1.5.  Qualification of personnel 
The generator must be operated only by authorized and trained specialists with detailed knowledge of the 
international, national or manufacturer’s test standard. 
 
1.6.  Inspection before Use 
1.6.1.  Damage due to Shipment  
The instrument was tested before shipment and was packed carefully on a transport palette. Each box is marked 
with a detailed list of the contents. 
Before activating the equipment, check for damage which may have occurred during shipment. Check each 
container as well as the generator itself. In case of physical damage, contact the manufacturer before operating 
the unit. 
 
 
Figure 1 - Rack shipment 
 
   
Figure 2 - System shipment 
 
Figure 3 - Single equipment shipment 
 
1.7.  Power requirements  
Prior to turning the equipment on, check that the selected voltage corresponds to the supply voltage.  
 
The position of the voltage selector must correspond with the 
mains. If you change the mains voltage, replace the fuses 
according the recommended value on the number plate. 
 
Figure 4 - Power Requirements