Armfield Instruction Manual
30
31. Open pump B, remove the tube, and transfer the tube to Pump A.
32. With Pump A open, set the speed of the pump to 30%. The pump should
begin to operate.
33. Close the pump lid. Water should now be drawn along the flexible tubing from
the large process vessel, through Pump A and the differential pressure
sensor then out to drain.