EasyManua.ls Logo

Atlantic 024306 - Commissioning

Atlantic 024306
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 50 -
Commissioning
- Close the installation's main circuit breaker.
Upon initial start-up (or in winter), to preheat the
compressor, engage the installation's main circuit
breaker (outdoor unit power supply) several
hours before starting any tests.
- Press the heat pump's Start/Stop button.
To ensure that inputs EX1, EX2 and EX3 operate
correctly: Check that the electricity supply's
neutral phase polarity has been respected.
When the power is switched on and every time that the
ON/OFF button is switched o and then switched on
again, the outdoor unit will take approximately 4 minutes
to start up, even if the setting is requesting heating.
When the power is switched on, the "Easy Start" quick start function allows you to set the appliance's initial settings.
- Turn the knob to choose the language.
- Press the knob to accept.
Easy Start
English
- Turn the knob to adjust the date. Press the knob to accept.
- Repeat this operation for the month, year, hours and minutes.
Easy Start
09: 45
Monday September
12
2016
Summer / winter time Automatic
- Set the appliance's power.
Easy Start
Alféa ---
-- KW
- Set the Electrical backup power:
3kW / 6kW / 9kW / None.
3 KW
Electrical back-up
Easy Start
Alfea Extensa A.I. R32 / INSTALLATION / 2114 - EN

Related product manuals