EasyManua.ls Logo

Atlantic 024306 - Page 85

Atlantic 024306
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 85 -
Starting-up
OK Not compliant
Quick Start Procedure (see chapter " Commissioning", page 50).
Close the installation's main circuit breaker (outdoor unit power supply)
6 hours before testing => Preheating of the compressor.
Press the On/O Switch => Initialisation takes several seconds.
Operation of the heating circulation pump.
Venting of the pump PAC (heating).
Bleeding the installation.
Outdoor unit starts after 4 mins.
Con gure Time, Date and Heating circuit, DHW period programs if di erent from the default values.
Con gure the hydraulic circuit.
Adjust the heating gradient.
Adjust the max ow setpoint.
Outdoor unit checks
Operation of fan(s), compressor.
Current measurement.
After several minutes measure the di erence in air temperature.
Check condensation and evaporation pressure/temperature.
Hydraulic unit checks
After 15 mins of operation.
Primary water temp. di erence.
DHW priority (switching of distribution valve).
Operation of heating, boiler backup, etc.
Control (see chapters
" Controller Interface", page 44 and " Controller Menu", page 52)
Settings, maintenance, checks.
Program the heating periods.
Adjust the setpoints for the heating circuits if di erent from the default values.
Setpoint display.
Explanations of use
The heat pump is ready for operation !
Alfea Extensa A.I. R32 / INSTALLATION / 2114 - EN

Related product manuals